Showing posts with label spokes. Show all posts
Showing posts with label spokes. Show all posts

Thursday, 13 May 2010

For the Greater Good

Sorry about the Hot Fuzz start to this blog, but it matches the out comes quite nicely for the programme meeting we had yesterday.

Last week has been interesting for the project. In discussions with one spoke it was clear that some changes had been made to the processes around course design with little expectation of making a large impact on the creation of more flexible awards. This matched discussions at the programme meeting about whether changing processes and documentation alone will make the desired changes we need within institutions. There is hope that the changes made as part of the spoke will support more responsive curriculum design and a slicker curriculum portfolio. Discussions then turned to how these expectations would be evaluated, there is some difficulty in this a much of the baseline for the spoke was based on perceptions. The spoke will be using the expectation spreadsheet it completed at the start of the project along with the JISC Evaluation workshop notes, to support the evaluation process. The spoke is also reviewing the usefulness of recording date information against each stage of the process for faculties to measure responsiveness.

The JISC programme meeting raised an interesting discussion around institutions expectations of learner and staff cultural attitudes to technology and how this differs between institutions. As we, in the project, talk a lot about culture being a barrier to change is there a practical way of addressing this? Bolton spoke briefly on training they are providing for staff around supporting using technology for learning. Does Enable need to think about putting together training for staff to help manage these cultural attitudes, using faculties who we have identified as already making those changes? I’m not sure we would be the right people to do this but we can try talking about it to the right people. Some projects in the programme have created tools to help staff identify their teaching approaches and what others are doing in their institution.

The final part of the day was a discussion summarising the work projects have been doing and how it can be used to help others, stopping duplication of effort at a higher level than simply within an institution. The projects discussed whether it would be possible for them to bring together the combined effort using design studio or whether it was something that needed to be organised centrally with everyone in a room. The idea of an information roadmap was seen to be useful and projects were happy to provide information to support it, although what information was needed and in what form was difficult to determine. Some felt that information needed a context within a process map (or in a model) and Bolton demonstrated the work they were doing with the FSD programme. I personally feel that a generic model to support staff with a starting point for discussion would be useful, and that validation documents themselves would be of little value. Perhaps a quick model/map with each stage a clickable link to a list of information collected/used would be best. It will be interesting to see the out come of this session will be.

Added 24/05/2010

Further relevant blogs:

http://jisccdd.jiscinvolve.org/2010/05/19/sustaining-curriculum-change/

http://blogs.cf.ac.uk/palet/entry/jisc_programme_meeting_brass_tacks

Friday, 8 January 2010

Having a n-ice new year

Sorry about that! Things are quiet for me at the moment, as I have been house bound for the last three days thanks to the ice on the roads by where I live. Fortunately Sam has been carrying on with interviewing staff around the curriculum design processes for mapping and for capturing more issues. We have created a long list of issues from the 2009 interviews, as part of this I have tried to group them in different areas and themes it seems that the issues can be broken down into the following areas:
  • Strategy (Culture, Product, Resourcing)
  • Student Support (Communication, Marketing, Systems)
  • Course DD (Communication, Annual Monitoring, Marketing, Engagement, Product, Processes)
  • Course Information (Communication, Systems)
  • Course Support (Resourcing)
  • Global (Communication, Culture, Engagement, Id Management, Processes, Project Management, Resourcing, Systems)
  • Partnerships (Communication, Marketing, Processes, Progression, Resources)
  • Project Management (Resourcing, Scoping, Systems, Timescales)
These will be discussed further at next weeks SMWG as long as snow doesn't get it cancelled. We really need this SMWG as the last few have been cancelled due to clashes either with JISC events or with other senior management meetings. We were hoping to be discussing the Programme Office principle at this meeting but it looks like this has got bigger than Enable and the executive are now interested in the model I have documented. Not sure what is going to happen next on this, but all sounds very positive still.

Other than the spreadsheet I have been catching up on previous Elluminate sessions that JISC have been running via the circle network, and managed to catch one live on Wednesday thanks to working from home. Some interesting discussions are going on out there on how to manage organisational change and addressing cultural issues to changing curriculum delivery.

Over the next week I am expecting some interesting reports from our project partners summarising their experiences over the last year with Staffordshire University. Will report on these and other points raised in this blog as soon as I can :)

Tuesday, 7 July 2009

The Learner Experience

Last week I attended a focus group looking at the learner experience for the distance learner from point of induction onwards, I spent a lot of the time listening to the experiences of staff around the table dealing with learners different needs and thinking about how the learner experience can be made better during the curriculum design and development phase. A number of issues appeared to be linked to this area including providing materials for study (could be reading lists, amazon shopping lists, or posting resources) costing models for awards (including how study materials are costed into course costs, should they be fixed for period of study, how clear are costs communicated to learners, is this included in validation documentation?) and what online tools should be included to support distance learning - and getting the learners to understand what skills they will need when enrolling on a distance learning course. These last two points need to be considered at design stage, what is good practice (for example photos of staff online, managing expectations with online communication etc) to promote the relationship between tutor and learner. I will be keeping an eye on this work for Enable, and will be using its outputs to feed into any work we are doing.

It seems that once these focus groups are completed with staff there will be a number engaging learners after September, I have mentioned the workshop I participated in with JISC (mentioned in my last blog) and how that could be helpful with the learner experience, in particular the diary room approach could give a good idea of the learner experience changes in the time they spend studying with Staffordshire University.

Tuesday, 30 June 2009

Summer Holiday

Well you may have noticed that blogs have been a bit thin on the ground, this is due to a number of reasons, one of which links to the summer holidays, I have been enjoying some short weeks, and will continue to be doing so until the end of August (which is nice!) as has my colleague. Sam has been working hard on the baseline for JISC and the project, while that has been going on we have also been talking about the next stage of the project, the review, while sorting out the next stage of interviews, and attending JISC workshops on Phoebe and Learner Engagement. All these things have been very interesting and are worthy of mention.

The Learner Engagement workshop was very interesting and linked nicely to a meeting I was in the day before with our study skills team, and I will be passing my notes from the day on to them and other spoke projects we are engaged with talking to. As part of the day the project team need to write a learner engagement plan, which I have started, and am hoping that the rest of the team contribute to before the 15th July (when it needs to be "handed in"). I will be using the information from this day during the meeting with the Student Union too.

As part of the next stage of the project, we have created a new, closed, Elgg group at Staffordshire University to discuss issue groups (such as do we even want to call them issue groups) and the up and coming SMWG that we are planning for at the end of July. We are still putting notes from events and interviews up into our open Elgg group so that our spokes can see what is going on, and I am in talks with the Elgg administrator to see if we can get any useful statistics out of it about views to see if it is being used at all.

Thursday, 28 May 2009

The next step

We had a full day yesterday as a team working through the next step of the Enable project, talking about the final part of the Investigation phase and the evaluation plan and what we are actually looking at evaluating, considering the bi-polar nature of the project. We have noted the usefulness of the Archimate/ Enterprise Architecture work that Sam has been doing for the process of Curriculum Design and Dev and we are now planing to use the same method to look at how we manage the process of change with this area. By creating a baseline of how the situation is at the moment, and how Enable has already been embedded in how we get new issues raised with senior staff we can track how we want to move forward, what roles will be needed in the future and what works.
I have a number of jobs to do based on this day too, a number of documents that need to be written to summarise the work we have been doing up until now, a refined project evaluation plan and motivating stakeholders (such as the partners) to write not just scenarios about what they would like in an ideal world, but their expectations from the Enable project (and the spokes involved in it). When doing the evaluation we need to think about measuring the totality of impact of the spokes, rather than the impact of each individual spoke (as they should be doing that as part of their own projects). This again links to managing a programme of projects and requires a bit of research on how we can do that. I have a number of spreadsheets and questionnaires that should help with this process.

Wednesday, 29 April 2009

Themes and Issues

We have got together as a team to go through the different initiatives against the 5 themes that were created at the start of the project, and we noticed something very interesting. In each case although there would be one main theme highlighted by the initiative team, the initiative would often fit into three or more of the themes highlighted, that may not have been recognised by the initiative team . Is this due to the closed nature of the initiatives themselves and how we as a university manage them? We also realised that there were clearly two different types of themes emerging the first around the Curriculum Design and Development, the other change management. As each initiative was highlighted we were able to see 9 emerging change management themes, including issues around breadth and depth, stakeholder engagement, and silos. A full break down on themes and how they fit with the initiatives will be made available once the initial process mapping stage is complete.

Thursday, 11 December 2008

Linking together

Had an interesting conversation with Sam on Monday afternoon about how the spokes will all link together, and that we need to start thinking about the themes and who will fit in each one. We have started on a simple map of all the spoke names we have spoken to and put in initial lines on how they fit together. We have been pleased to note during some interviews projects have been talking together, but there are still some obvious gaps where the theme groups will work.
This morning I am off with Richard Benefer and Sue Lee to talk to the HE forum at Newcastle college about Enable, I have loads of handouts for them, including what we will expect from them for the funding and how they fit into the project as a whole. A lot is a duplicate of the meeting we had with the partners at the end of October. I will feed back on this meeting as I am hoping for some useful conversation to come out of it.

Monday, 8 December 2008

Perceptions of Student Recruitment Information

We had an interesting conversation this morning around how the University markets itself to different learners.

We found that the recruitment of learners can be something that is the responsibility of a number of different stakeholders in the institution which can cause confusion over the message going out to potential students.
  •  Faculty:  Award leader and or Link tutor (for partner colleges)
  • Services: Marketing team, student recruitment or AimHigher
Each stakeholder perceives themselves as the data owners, thus when changes occur to the content they can feel that they have lost control of that information, or that information has been misinterpreted.

Issues around student marketing/recruitment start right at the beginning of course development as one of the first templates require staff to estimate student numbers for the award. Without support from marketing and student recruitment these numbers can be difficult to collate. Not only that but all award documentation for course design is focused on either faculty/senior management viewing or for Quality Assurance.Therefore to to promote awards to potential students there needs to be a change in language which means a duplication of effort in creating more materials - saying the same thing slightly differently!
There is an initiative in the university that is looking at bringing the efforts of student recruitment and AimHigher together, however there are some interesting holes in the processes around recruitment and marketing within the university. Some work is occurring with the Student Experience around this issue being done by Paul Baron, who we spoke to last week.  He is supporting investigating how we manage the product portfolio, how new markets are identified and how communication is managed between the university and prospective learners.

Friday, 5 December 2008

Faculty and Process Spokes - Feedback

UPDATED 2012-06

We have had another busy week here, talking to members of faculties, those reviewing processes in the University, and taking part in Annual Award Reviews. It all feeds into what we would like from Curriculum Design and Development.

An issue highlighted from interviews recently was around using templates for faculties in course design. There are a number of different course design templates that need completing, and even when training is provided they can still be interpreted and completed in a number of different ways.

UPDATE: By creating FLAG we are hoping some of these issues will be taken out of the equation, although we are still waiting for feedback on this, and there are some rather big changes expected in the near future around forms faculties will need to complete, these will be reflected in FLAG.
There are also some new spoke initiatives, Document Management, that will support how information is collected within a workflow. XCRI-CAP which is looking at what information is stored, how it is stored and inputted into existing systems. XCRI-CAP will be looking at creating a single source of truth of course information and therefore will be looking at the quality of information collected. The Student Systems Project is also looking at course information, and is working in tandem with the XCRI-CAP project team.

When asked for "blue sky" ideas we heard about:
  •  personalised prospectus and website.
UPDATE: With the new XCRI-CAP project being run by Sam Scott this 'blue sky' thought is becoming closer to being a reality. Importantly Sam is working closely with the Enable team to understand the impact of her work, alongside that of other initiatives within the institution. In particular Sam is working on using ArchiMate models to communicate how this can happen and what can cause issues.
  • experiences should be personal to those we are trying to engage
UPDATE: This fits with the new University Strategy and the Academic Plan, including focusing on graduate attributes. However at this time this hasn't been clarified completely, how are we going to do it? FLAG has been designed to ask the questions of course designers and gives some guidance on opportunities for personalisation of course delivery, however systems and information in the university still make this very difficult.
  • and that the addition of negotiated modules onto traditional awards as options would be useful.
UPDATE: Recent restructuring of awards may make it possible in the future. Although there has been no mention of this particular goal in university documents, it does fit with personalisation of award delivery and design.

I have yet to have time to blog about last weeks training and conference work, but I am hoping I will get some time free soon to do that! Next week we have more interviews and we will be presenting to our first college partner HE Forum.

Friday, 28 November 2008

Feedback, Planning and Meetings....

We have had some feedback about the logo, fortunately it is all positive and therefore we now officially have a logo! Thanks to Sam for his hard work on this and to Marketing for giving us a nice vector version of it.
We are still organising initial meetings for the different initiatives highlighted by the SMWG, as we are making initial contact there has been some issue with project staff understanding the purpose of Enable and their involvement. However this has been addressed with a simple email paragraph to explain what the project is and how they have been identified as a person of interest.
Mark has been talking to the MIAP (Managing Information Across Partners) project (external) around the unique learner number, and how it can be implemented as a pilot in Staffordshire University. This linked to the work I did at the CETIS conference around supporting flexible provision and around technology supporting WBL, and whether this project would be of use to the community (yes!). We also looked at how processes needed to change. We looked at the Validation process, which links nicely with the work being done in QIS and I will need to send my notes on this to Sue Lee, the project manager for DIVAS. The CETIS conference will be written up more on my own blog, along with my thoughts on the training I had yesterday with Sam around complex project management.

Friday, 21 November 2008

Investigations

I promised to write a bit about the project interviews, at the start of the week we spoke to Beebe about work in marketing around collecting course information from faculties and then delivering that to both perspective learners and to existing learners, at the time they were investigating using Blackboard as a source, however since we meet she is now thinking about the problems around duplicating data silos and also about not linking new data to what already exists in the university. This linked to the fact that she had not been aware that courses could also be delivered at colleges, and in these cases they could use either Blackboard or their own VLE. We were also able to tell her about the repository work that is going on in the university that could be used to help her. She was able to tell us about another initiative she is working on, around the university intranet "MyPortal" and looking about providing learners with more personalised information. We have been invited to the next two meetings around these areas.
We also spoke to Mike from Faculty in Computing, Engineering and Technology (FCET), about his negotiated learning award. This was very interesting as this is a programme of awards from undergraduate to post graduate that has been designed with an employer. It has successfully gone through validation but due to managing resources within faculties there is limited resources available to run new awards at this time of the year, although the employer wanted to start delivery the day after validation.
Further converstations this week included one with another member of FCET, who was speaking about their internal investigation into looking at Distance Learning, marketing of awards, and internationalisation of delivery. He was experiences issues around trying to change staff attitudes to delivery and how we, as a university, deal with marketing courses in other countries. He did say that the faculty was very proud of its ability to support work based learning and work placements, and that they were interested in taking this further with their distance learning.

Tuesday, 18 November 2008

Scoping and Branding



Well the great work of Sam has paid off and the decision has been made to go with this as our logo (although we are checking with Marketing to ensure there are no problems with using this from a corporate perspective). It is a simple on button using the Staffordshire University red in both the text and the button itself. Let us know if you like it!

Yesterday Mark, Sam and I met with two of the initiatives involved in Enable, the Course Information/ Intranet Project lead and the lead for the Negotiated Award in FCET. The notes from these meetings are on another computer so will be looking at posting about them later in the week. Today I had my weekly meeting with Mark where we discussed the project scope and the criteria needed to identify the position of initiatives within Enable. This included looking at 4 types of projects

  1. Transformative,
  2. Improving,
  3. Facilitating and
  4. Supporting.

Those that fitted into 1 & 2 are either spokes or exemplars, those in 3 could be spokes, or not, depending on their nature, and those around supporting curriculum design and development were deemed to be out of scope. We also discussed further the outputs based on work done at the JISC meeting. This is so a leaflet can be put together for project dissemination and includes:

Goals

  • Curriculum design development process which is coherent, responsive, customer focused, joined up etc
  • Technologies in place to facilitate/ support in a flexible and responsive way
  • Appropriate level of control and minimum bureaucracy, in terms of change process want a managed approach to change initiatives.

Outputs

  • Process holes
  • Process improvement opportunities
  • Lack of data
  • Process & system connectivity issues

As a result of these we should spawn new spokes, which help formulate the GOALS.

This work was discussed during our meeting with Cathy Gilbert who, from previous roles, has experience in programme management and has been very helpful in the area of supporting documents for this project.

Friday, 7 November 2008

Understanding Validation from the SURF Office perspective

We had an interesting meeting with Richard, from the SURF office on Tuesday afternoon. This was the first of our in depth interviews with spokes, which took a good hour and a half and could have gone on much longer. We have decided to continue the meeting at the end of January. At this, initial, meeting we spoke about how a particular college is going through award development with an employer. We spoke about some of the issues around validation, such as why isn't anyone from a second SURF college involved in the university side of the validation panel? How are external panels picked? How is content for the award quality controlled and shared with other colleges running award? So some interesting things have been raised and I am sure even more will be raised at the next meeting.